Pit Tagged Coho 09
The first detection in the flume was on 05/05/09 at a flume discharge of 220 cfs
Detections continued until 06/25/09 the last day of flume operation, with the lake level still at 2239 ft (16 ft above spillway crest)
Only 193 of the 11,934 released were detected in the flume
The rate fish passage through the flume appeared to be some what correlated with forebay elevation and/or flume discharge